NNeedle Factory

Needle Factory

Measure a Find The Needle production line

A faster machine helps steady output only when it raises the lowest effective stage rate. Use one common unit, then keep the original batch estimate separate from the proposed capacity comparison.

Updated 12 October 2026 (Beijing date). The examples are fictional and were authored by the site owner with AI assistance. No game machine rate or measured gameplay timing is claimed.

Get the correct demo

Use the Steam listing linked here. Do not confuse it with similarly named hidden-object games.

Choose one common unit

Measure every stage in the same unit, such as hay strands per minute. If a recipe converts units, convert rates before comparing them.

Enter observed rates

Add up to six stages with their measured capacities. Zero means the line is stopped; a blank field is unknown and must be filled.

Use the bottleneck estimate

The lowest stage rate is the serial-line capacity under steady-state assumptions. An upgraded non-bottleneck stage may not improve total output.

A fictional 800-unit line: 100, 80 and 120 per minute

Collection, Processing and Sorting use one common unit. These invented rates match the planner’s illustrative example; they are not game machine statistics. The slowest stage gives 80 units per minute, so the original capacity-only estimate for 800 units is 10 minutes.

Fictional capacity changes, all in the same units per minute
Proposed changeOriginal capacityProposed line capacityInterpretation
Processing 80 to 11080100Collection at 100 becomes the limiting stage.
Sorting 120 to 5008080Processing at 80 still limits steady capacity.
Two stages at 80; change only one to 1108080The other tied bottleneck remains.
Processing 80 to 608060A proposed change can reduce capacity.

Convert recipe ratios to a common unit before comparing stage rates. The planner does not perform recipe conversion, know machine prices, or select an optimal purchase.

Ten steady-state minutes are not an empty-line completion test

A separate toy starts every machine empty, processes one item per service, uses unlimited intermediate buffers and deterministic service times, and has enough input with no travel, power, storage or downtime losses. With the fictional 100/80/120 rates, the first item takes 1/100 + 1/80 + 1/120 minutes to pass all stages. The next completions are spaced 1/80 minute apart.

In that toy only, the 800th completion is 6011/600 minutes, about 10.01833. Changing the third rate from 120 to 500 leaves steady capacity at 80 per minute but changes the toy’s last completion to 10.012 minutes. Startup is 0.38 seconds shorter. Neither result is a measured game time; this reference adds no startup simulator.

Keep zero, missing and not requested separate

A known zero-capacity stage stops the line, so a positive target is unreachable in this model. A zero target needs zero batch time even when capacity is zero; it does not make the line run. An omitted optional target gives no batch-time estimate. A blank required rate is rejected instead of silently being treated as zero.

Questions about the worked reference

Does the batch time change when I compare an upgrade?

The planner shows the original batch-time estimate alongside the proposed line capacity. It does not recalculate batch time or report new bottleneck names after that change. In the fictional 800-unit example, 10 minutes describes the original 80-per-minute capacity. A separate capacity-only calculation at 100 per minute gives 8 minutes.

Does no steady capacity gain mean no timing property changes?

No. In a separate empty-line toy with one item per service, unlimited buffers and deterministic service durations, a faster non-bottleneck can shorten first-item latency while the slowest stage still limits steady capacity. This is not a game timing measurement or a startup simulator built into the planner.

These original examples were prepared with AI assistance. Nine valid configurations matched the original source and Python Fraction arithmetic; five invalid configurations were rejected. Three separate empty-line toy cases matched exact event replay and a first-item formula. These source and arithmetic checks do not establish gameplay performance or verify in-game timing.

Use the existing manual planner or read the owner-published worked reference and CSV/JSON examples. The reference files are separate; the website has no CSV import.

Download the original reference cases

The capacity CSV contains nine fictional inputs and expected reports. The second CSV contains three separate empty-line toy references with their assumptions described above. These are reference files; the planner has no CSV import.

Download 9 fictional capacity cases (CSV)

Download 3 empty-line toy references (CSV)

Source links

Official Find The Needle Steam page ↗